After a very wet night, several leaks became evident and the roof had to be stripped of all the laths and old felt ready to be re-sheeted to make it waterproof.
Thursday, January 22, 2009
Thursday, 22 January 2009
The electricians have been wiring in the loft, sockets, lights, etc., in readiness for the walls to be boarded, while the builders carried on with the loft rebuild.

After a very wet night, several leaks became evident and the roof had to be stripped of all the laths and old felt ready to be re-sheeted to make it waterproof.
After the roofing work was finished, they all got to work inside the loft constructing the studded walls of the en-suite and insulating them. Meanwhile Mike was busy doing all the pipework for the radiators.
After a very wet night, several leaks became evident and the roof had to be stripped of all the laths and old felt ready to be re-sheeted to make it waterproof.