A lovely bright, dry day today meant that work could start on slating the sun room roof and Fred could get back outside to start the top coat on the rendering:
Because the walls are so bad in the sun room and kitchen extension, Mike plasterboarded these today:
Two of the walls in the en-suite have been grouted and the shower and toilet fitted. A little tweaking is needed with the cistern top but what a difference a day makes - we're really pleased with how it's turned out:
Wednesday, March 4, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment