None of this could have been achieved without our lovely builders:

Mark, Mike, Sid, Al and Fred

Wednesday, March 4, 2009

Wednesday, 4 March 2009

A lovely bright, dry day today meant that work could start on slating the sun room roof and Fred could get back outside to start the top coat on the rendering:











Because the walls are so bad in the sun room and kitchen extension, Mike plasterboarded these today:











Two of the walls in the en-suite have been grouted and the shower and toilet fitted. A little tweaking is needed with the cistern top but what a difference a day makes - we're really pleased with how it's turned out:

No comments: