A bit of a frustrating day today where the kitchen was concerned. It appears we got "integrated" mixed up with "built under" and the wrong fridge was ordered. This will have to be returned and the correct one should be delivered on Tuesday. You'd think the kitchen designer would have pointed this out, but perhaps he assumed we knew the difference! Also, the 900mm pan drawer unit to go under the hob was missing and a 1000mm base cupboard was delivered instead. Another one to go back. A couple of end panels are also needed.
Mike had to move some pipework in the kitchen in readiness for the cupboards to be fitted next week.
The sink in the main bathroom was completed, with the pipework for the hot and cold water and the waste being fixed and the side shelf was fitted back on. Just the towel rail to fit onto the unit now.
The awning over the kitchen window was refitted and a bit of a general tidy up was carried out.
Today we lose two of the guys as they start another job on Monday. So we said goodbye to Al and Mike. Mark, Sid and Fred will be back on Monday for a few days.
We're not sure if this had anything to do with Mike not coming back next week, apparently he had a few pints of Guinness last night!
(Only joking, he was using the hose pipe to clean off the slabs.)
Bye Al............................
Bye Mike. Thanks for the eggs and the food and the recipe ideas.
Don't forget to come back and see us sometime.