Mike was plumbing and getting the wires through for when the electricians return. He also plastered the wall at the side of the French doors where the old plaster had been removed. The pillars are all that's left of the wall between the sun room and the kitchen and these have also been boarded and plastered.
The roof is now all ready for slating and for the Velux windows to be sealed in.
And Fred continued with the painting, but today he was inside! He applied the first two coats inside the landing cupboard and on Saturday Paul applied the first top coat. It's a bit patchy so he'll put another coat on tomorrow.
No comments:
Post a Comment