Whilst we were away the rest of the steels were installed for the new loft floor, also some of the 8" x 3" new floor joists in readiness for the flooring:
When we visited the house this morning we found the floor in the loft was now down and studding for the rear wall of the loft had been fixed.

This picture shows the full extent of the steel once the old dormer had been removed:

They've also been working on the area where the new staircase is to be installed.
The electricians have been installing light switches and sockets and look - we have spotlights in the kitchen!