None of this could have been achieved without our lovely builders:

Mark, Mike, Sid, Al and Fred

Wednesday, January 28, 2009

Tuesday, 27 January 2009

While we were out today choosing and ordering the bath, the toilet for the en-suite and looking at shower cubicles (for the en-suite), the old staircase to the loft was removed and the new staircase (all wood - none of your MDF, the army don't like it!) with top and bottom landings installed. The underside of the staircase in the second bedroom was insulated and plasterboarded:
























The side wall by the stairs was formed and boarded, plus more plasterboarding in the loft along the back wall and the ceiling: