While we were out today choosing and ordering the bath, the toilet for the en-suite and looking at shower cubicles (for the en-suite), the old staircase to the loft was removed and the new staircase (all wood - none of your MDF, the army don't like it!) with top and bottom landings installed. The underside of the staircase in the second bedroom was insulated and plasterboarded:
The side wall by the stairs was formed and boarded, plus more plasterboarding in the loft along the back wall and the ceiling:
Wednesday, January 28, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment