Monday, November 3, 2008

Monday, 3 November 2008

Today the floor tiles have been removed from the utility room. Another good tiling job done by the previous owner (not), Mike reckons slightly thicker gravy was used in this room compared to the toilet! At least we wont have to feel guilty about destroying any quality workmanship! The utility room is now ready and waiting for Neil to fit us into his busy schedule. Once he has tiled this room we can refit the cupboards and order the new worktop and sink.

The wall between the airing cupboard and bathroom has been removed ready to construct the new shower cubicle which will go into the rear of the old airing cupboard and the ceiling has also been removed:











All of the shower cubicle has been removed and our Hunky Army have installed their own temporary designer model (i.e. a makeshift cubicle comprising of plastic sheeting with the shower attached to a wooden frame. Very innovative!) The old tiles have been removed from the shower area which revealed that some of the adhesive hadn't even gone off due to the damp problem caused by the shower leaking.


The doorway and part of the wall to one of the bedrooms was removed, mainly because of previous poor workmanship (no surprise there then!). This will be rebuilt with a standard sized doorway with room for wardrobes on the wall behind.